Home   >  References

MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR THE NEW BIOMASS POWER PLANT, SPAIN

marine pipelines-p

  • Start Date / End Date: 2014
  • Place: LAS PALMAS DE GRAN CANARIA AND GRANADILLA, SPAIN
  • Scope: Reports
  • Description:

    The work for this study to find different options for the location of a new biomass power plant in the Canary Islands includes the following studies:

    The characteristics of the pipe:
       • A marine climate study to find a location in La Esfinge
       • An outfall dilution study to find a location in La Esfinge
       • A marine climate study to find a location in Granadilla.
    The studies were done using the CORMIX model, in the case of the initial dilution studies, and the SWAN model, in the case of the wave study.


 IMAGES OF THE PROJECT

 
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR THE NEW BIOMASS POWER PLANT, SPAIN
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR THE NEW BIOMASS POWER PLANT, SPAIN

 RELATED PROJECTS

See more projects
PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)...
INTAKE AND OUTFALL PIPELINES FOR THE SANITATION AND SUPPLY SYSTEM IN T...
STUDY OF INITIAL DILUTION OF THE OUTFALL FOR THE CAMPO DALIAS, ALMERIA...