Home   >  References

LIQUID BULK TERMINAL AT PUERTO BAHIA, CARTAGENA, COLOMBIA. OFFSHORE INFRASTRUCTURE AND OPERATIONS JETTY

Jetties

  • Start Date / End Date: 2011/2012
  • Place: Cartagena de Indias (Colombia)
  • Scope: Analysis, Reports, Quantities and Basic Project
  • Description:
    1.Document analysis and basic project. Identification of deficiencies, vagueness and contradictions. Assessment of risks and opportunities.  Quantities.
     
    2.Improvements to the base solution defined: a piled jetty with two mooring posts for tankers, with a maximum freeboard length of 275 m (Suezmax).
     
    3.Proyecto Variante:
        •    Geotechnical study: land modelling, geotechnical units, parameterization and profile.
        •    Independence of integrated mooring dolphins
     
        •  Calculation of the viaduct deck. Two options: precast slabs and in situ.
        •    Viaduct pile  optimization (lengths and thicknesses). Vertical instead of inclined
        •    Drawings
        •    Quantities
     
     

 IMAGES OF THE PROJECT

 
LIQUID BULK TERMINAL AT PUERTO BAHIA, CARTAGENA, COLOMBIA. OFFSHORE INFRASTRUCTURE AND OPERATIONS JETTY

 RELATED PROJECTS

See more projects
BASIC PROJECT FOR A HYDROCARBON TRANSFER TERMINAL IN THE BAY OF MONTEV...
NEW LNG REGASIFICATION PLANT JETTY PRE-DESIGN...
PRELIMINARY NAUTICAL STUDIES FOR LNG REGASIFICATION PLANT MOORING JET...