UNDERWATER PIPELINES

  • Start Date / End Date: 2007/2008
  • Place: MONTOIR (FRANCE)
  • Scope: Construction Design
  • Description:

    WATER TANK

    Technical support calculations and construction level drawings of the discharge system of the Montoir CCGT Power Plant 435 MW:

        •    Excavation via sheet piled walls. Calculation via RIDO program.
        •    Platform reinforced with piles.
        •    Reinforced concrete intake well.
        •    Modelling via SAP 2000 program.
     

    DUMPING RAMP

        •    6 PEAD pipes each measuring 21 m in length. Structured pipe. Diameter = 2,000 mm.
        •    Design of special diffuser parts at the end of pipes
        •    Hydraulic design advice. Analysis and validation of developed hydraulic models, some of them with ANSYS program.
        •    Hydraulic calculations.
     
     

 IMAGES OF THE PROJECT

 
DESIGN OF WATER TANK AND DUMPING RAMP OF THE DISCHARGE SYSTEM IN MONTOIR DE BRETAGNE (FRANCE)
DESIGN OF WATER TANK AND DUMPING RAMP OF THE DISCHARGE SYSTEM IN MONTOIR DE BRETAGNE (FRANCE)

 RELATED PROJECTS

See more projects
PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)...
INTAKE AND OUTFALL PIPELINES FOR THE SANITATION AND SUPPLY SYSTEM IN T...
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR TH...