CONSTRUCTION PROJECT OF AUXILIARY INSTALLATIONS FOR LAUNCHING MEGA-PIPES IN BENI-SAF (ALGERIA)

UNDERWATER PIPELINES

  • Start Date / End Date: 2007
  • Place: BENI–SAF, ARGELIA
  • Scope: Development of Construction Project
  • Description:

    Construction project of the Beni-Saf auxiliary installations for launching and stockyard of submarine pipelines.

    The installations are comprised of:

        •    Teflon launch ramp.
        •    Very deep sheet piled trench
        •    Pedestrian walk over trench for the passage of residents.

     

    The pipelines are:

    •PE80 sea water intake pipes
        •    Inner diameter: 2,400 mm
        •    Length : 1,200m
    •PE80 brine effluent pipeline outfall
        •    Inner diameter: 1,800 mm
        •    Length: 1,574 m

     

    All pipes have ballasts.

     

     


 IMAGES OF THE PROJECT

 
CONSTRUCTION PROJECT OF AUXILIARY INSTALLATIONS FOR LAUNCHING MEGA-PIPES IN BENI-SAF (ALGERIA)
gestor/recursos/imagenes/conducciones_submarinas/conducciones-submarinas-96.jpg
PIPE SINKING. LAYING
SHEET PILE. AUXILIAR BREAKWATER

 RELATED PROJECTS

See more projects
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL FOR THE R...
WAVE STUDY AND RECIRCULATION STUDY FOR DIFFERENT DESALINATION PLANTS I...
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL TO ADAPT ...