  • Start Date / End Date: 2016-2018
  • Place: Colonia (Uruguay)
  • Scope: Construction Project
  • Description:

    For the Project, a construction design was done for the treatment plant underwater pipeline including a provisional breakwater.
    The characteristics of the pipe are as follows:
    •    Material: PE100.
    •    Outfall pipe Øe=500 mm SDR 33
    •    Length: 300 m
    •    Maximum flow rate: 225 l/s
    A detailed study of the following aspects was done:
    •    A provisional breakwater in the surf zone measuring 150 m long.
    •    Sinking process.
    •    A study of the weighting for the river currents.
    •    A hydraulic study with transitory processes and pipeline cleaning through flushing.


 IMAGES OF THE PROJECT

 
CONSTRUCTION PROJECT FOR THE HOUSEHOLD WASTEWATER OUTFALL AT THE TREATMENT PLANT IN COLONIA (URUGUAY)
CONSTRUCTION PROJECT FOR THE HOUSEHOLD WASTEWATER OUTFALL AT THE TREATMENT PLANT IN COLONIA (URUGUAY)

 RELATED PROJECTS

See more projects
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL FOR THE R...
WAVE STUDY AND RECIRCULATION STUDY FOR DIFFERENT DESALINATION PLANTS I...
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL TO ADAPT ...